Equipment cables

Design & Engineering Support

Design & Engineering Support

All BGB Group scaffolding access solutions are based on expert designs which have been prepared and checked by qualified temporary works engineers.

This is backed by a clear and fully compliant paper-trail which includes:

  • TG20:21 compliance sheets for standard scaffold types
  • Full design packs for complex or non-standard structures
  • Calculations, drawings and wind load assessments
  • Anchorage pull tests with documented records


All of our design drawings are issued as “Construction Issue” and are available for consultation and inspection on-site at all times to promote full understanding and safety compliance by everyone involved.